Mina A’Salam, Jumeirah Group, Dubai (2021)

Supply, Installation & Commissioning of Water

Source Heat Pump Plant

Key findings:

  • Hot water generation through 8 x 105kW Electric Calorifier.
  • 60 m3 daily hot water consumption.
  • High Energy Consumption for domestic water generation.
  • Cold Water Generation thru heat exchanger from chilled water system.

Key solutions:

  • Removal of 1 calorifier, replaced by 2 water source heat pumps.
  • Integration of calorifiers and heat pumps with BMS for optimized use rate.
  • Domestic hot water generation alongside with cold water generation integrated in the chilled water circuit.

Improvement Workplan

Open chat
Hello 👋
Can we help you?